We are very fast. 4.5km+ in a day is achievable on a major lift pass. On a bedding pass we can achieve 16km/day.
Being able to complete the project quickly means that one slinger can usually keep up with 2 trenchers. This results in a massive cost saving compared to other methods.
Our speed means that more trenching can be opened in a day and left open later in the day. Closing the trench quickly leads to advantages in safety and lessons the exposure of the trench to weather events.
Because the machine is fully remote controlled, the operator can look into the exact part of the trench where the material is being placed and make small changes to conveyor speed and boom position to achieve accurate material placement. This is very important when it comes to expending money on imported material.
500+
PROJECTS
100+
HAPPY CLIENTS
10+
YEARS OF SERVICE
Case Studies
Read our successful case studies
Renewable Energy Sector Solar Farm – Coleambally NSW 2018.
This extraordinary productivity is unrivalled in the Renewable Energy industry and represented a significant step change in productivity for our client.
Read MorePetroleum Tank Installation – Cootamundra August 2018
Our Stone Slingers can reach all parts of the excavation usually from one place. We have the advantage of being nearly twice as quick as a crane at a comparable daily charge to a crane/kibble.
Read More‘Biofilter Backfilling- Yandina SE Qld. November 2018
In November 2018 our expert stone slinging team were tasked to backfill this biofilter in Yandina SE Qld.
Read MorePlease get in touch with our team for more information or a consultation