Placing Agregrate Over Fuel Storage Bund – Botany NSW 2021
We were contracted to use our stone slinger to place aggregate over a 5-metre-high fuel storage bund in Botany NSW.
The site was fuel storage facility with large quantity above ground tanks.
The client utilised our stone slinger (also known as a rock slinger) because we are quicker and more economical than an excavator which would have struggled to reach over the bund.
Utilising our stone slinger (also known as a rock slinger) also eliminated the risk of damage to the bund as no machinery was required to pass over the top.
We placed 500t of aggregate over the fuel storage bund quickly and efficiently.