We are very fast. 4.5km+ in a day is achievable on a major lift pass. On a bedding pass we can achieve 16km/day.

Solar Wind Farm Metropolis Services
Solar Wind Farm Metropolis Services

Being able to complete the project quickly means that one slinger can usually keep up with 2 trenchers. This results in a massive cost saving compared to other methods.

Our speed means that more trenching can be opened in a day and left open later in the day. Closing the trench quickly leads to advantages in safety and lessons the exposure of the trench to weather events.

Solar Wind Farm Metropolis Services
Solar Wind Farm Metropolis Services

Because the machine is fully remote controlled, the operator can look into the exact part of the trench where the material is being placed and make small changes to conveyor speed and boom position to achieve accurate material placement. This is very important when it comes to expending money on imported material.